Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileGcxOgy could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Hydro potential in Pakistan

sheeja's picture

The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers. The storage is fast depleting due to sedimentation.

Main Topic: 
Place of Publication: 
Mark Content Private(Internal): 
External URL: 
Main Type: 
Email Alert: 
72
Publication Date: 
01/04/2011