Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileeThrzv could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Telangana Solar Power Policy 2015

sheeja's picture

Telangana has a vast solar potential with average solar insolation of nearly 5.5 kWh/m2 for more 300 sunshine days. Government of Telangana (GoTS), intends to make use of the positive environment in solar market and push given by GoI for substantially harnessing the solar potential in the state of Telangana. This policy of GoTS on solar has provisions which aims at creating an enabling environment for prospective solar power developers to harness substantial quantum of solar power in the best possible manner. This in turn is expected to meet the objective of GoTS to provide competitive, reliable power supply to its consumers and also to ensure a sustainable fuel mix in the long run.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
12
Publication Date: 
18/05/2015
Document Type: