Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileSypzQv could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Renewable energy resource adequacy planning to meet RPO by the states in India

sheeja's picture

The aim of this study is to fill this critical gap by providing state-wise capacity that can be mobilized within the state to meet the RPO target and capacity that needs to be procured from other states. The mobilization of potential within the state also results in the creation of co-benefits in the form of local employment and economy boost apart from ability to generate renewable energy. This study also estimates the amount of storage requirement in each region to facilitate the smooth integration of RE into grid and preserve the resilience of grid.

Publisher : 
Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
16
Publication Date: 
16/02/2024
Document Type: