Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileLB2D5c could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Question raised in Lok Sabha on Global Warming, 22/12/2015

sheeja's picture

Question raised in Lok Sabha on Global Warming, 22/12/2015. The submitted Intended Nationally Determined Contributions (INDCs) submitted by India envisages that about 40 percent of cumulative electric power installed capacity shall come from non-fossil fuel based energy sources by 2030. It has proposed massive increase in renewable energy from 35 GW (upto March 2015) to 175 GW by 2022 through National Solar Mission and other activities in Wind, Biomass, and Small Hydro. India is aiming to generate 100 GW solar power, 60 GW power from wind, 10 GW bio-mass power and 5 GW small hydro-power by 2022.

Main Topic: 
Place of Publication: 
Publisher : 
Attachment(s): 
Mark Content Private(Internal): 
Email Alert: 
3
Publication Date: 
22/12/2015
Document Type: