Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileF5dI59 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

National repowering & life extension policy for wind power projects

sheeja's picture

The Ministry of New and Renewable Energy had issued ‘Policy for repowering of the Wind Power Projects’ on 5th August 2016 in order to create a facilitative framework for repowering. A review of the policy has been carried out taking into account representations received from various stakeholders, subsequent deliberations and stakeholders' consultation and a revised policy has been prepared. This policy enables repowering/replacement of older generation turbines with newer generation more efficient turbines even before the design life is over, if the developers/owners choose to do so. The revised policy considers refurbishment of wind turbines for life extension beyond design life subject to safety and performance assessment as per relevant standards.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
12
Publication Date: 
07/12/2023
Document Type: