Integrated EIA report for developing integrated faceilities within the existing Kandla port at Kandla
Submitted by lalit on Mon, 2014-02-03 10:43
An Integraged EIA report for developing integrated faceilities within the existing Kandla port at Kandla was drawn up by Delhi-based Mantec Consultants Private Limited to collectively assess impact and suggest mitigation measures for nine sub-projects listed as part of this development plan. The "integrated" report includes development of:
-
two barge jetties at Tuna and Khori creeks,
-
oil jetty to handle liquid cargo at Old Kandla,
-
upgradation of barge handling capacity at Bunder Basin,
-
a railway line from NH 8A to Tuna Port,
-
a multipurpose cargo terminal at Tekra off Tuna,
-
construction of rail over-bridge at NH 8A near Nakti Bridge,
-
mechanization of dry cargo handling facility at Kandla Port (Berth 7 & 8)
-
ship repair/ building facilities, container terminal on a BOT basis and
-
strengthening of two oil jetties.
Main Topic:
Mark Content Private(Internal):
Email Alert:
234
Publication Date:
01/09/2013
Document Type: