Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileypIhmG could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Guidelines for preparation of detailed project report for Rural Piped Water Supply Schemes

sheeja's picture

This is the finalized guidelines for preparation of detailed project report for Rural Piped Water Supply Schemes by Ministry of Drinking Water and Sanitation.

Main Topic: 
Attachment(s): 
Place of Publication: 
Mark Content Private(Internal): 
Email Alert: 
22
Publication Date: 
18/12/2012