Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileSKI20t could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Environmental Impact Assessment study for proposed river front development of 20 Ghats along river Ganga in Patna, Bihar

sheeja's picture

The present Patna RFD project will be implemented by NGRBA and for that assistance has been sought from World Bank. According to screening study and as per NGRBA’s framework the project falls under high impact category and hence an EIA study is required along with specific EMP. Also as per World Bank’s safeguard policy (OP: 4.01: Environment Assessment) an Environmental Assessment may be required if the proposed development work envisages to have some impact (adverse or positive) to surrounding environment.

Main Topic: 
Place of Publication: 
Mark Content Private(Internal): 
Email Alert: 
184
Publication Date: 
01/07/2013
Document Type: