Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://file8f0JDl could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

The economics of nuclear power

sheeja's picture

The Economics of Nuclear Power examines the reasons behind the huge delays and cost over-runs which are common to nuclear power construction projects, and concerns over safety and reliability of new technology, concluding: that in country after country nuclear construction has gone massively over budget; that long construction periods are symptomatic of a range of problems including managing the construction of increasingly complex reactor designs, and inherent within the ailing nuclear infrastructure; that combined with the huge subsidies required, uncompetitively high prices, poor reliab

Place of Publication: 
Main Topic: 
Mark Content Private(Internal): 
External URL: 
Main Type: 
dtelocal
Email Alert: 
68
Publication Date: 
01/11/2007