Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filew98Xpz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Dispelling myths: coal cannot be cycled to manage the variability of renewables

sheeja's picture

India has bold goals for renewables that raise several considerations for future grid planning and operations. The inherent attributes of renewable electricity generation i.e. stochasticity, variability and geographic concentration are perceived as a challenge given the dominance of coal in India’s electricity mix. More so when the grid is operated today far from optimally, with frequency drifts, load shedding, no provisions for reserve margins and an ancillary mechanism that is still in its infancy. The fact that India has a dominant coal fleet actually helps more than is visualised by the policymakers and grid operators. The objective of this paper is to trigger thoughts around the policy, market, and regulatory structures that enable flexible behaviour from (operators of) power plants for effective integration of all types of resources with the grid.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
8
Publication Date: 
01/09/2016
Document Type: