Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileLSA2MV could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

An assessment of India’s energy choices: managing India’s renewable energy integration through flexibility

sheeja's picture

This report examines the challenge of managing India’s renewable energy growth with increased flexibility in the system. This component specifically tries to address the dual issue of flexibility and stranded assets and looks at the plausibility of using existing coal-based power plants as flexibility reserves.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
27
Publication Date: 
01/05/2018
Document Type: