Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filewPuLKd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Agro residue utilization by thermal power plants rules, 2023

sheeja's picture

In what could be one of the effective ways to deal with the issue of air pollution linked to stubble burning, all coal based thermal power plants located in Delhi-NCR and adjoining area will have to mandatorily use a minimum 5% blend of pellets made of crop residue with coal annually. Environment ministry has come out with draft rules in this regard, making a provision of penalty (environmental compensation) for non-compliant power plants from the compliance year 2024-25 onwards. Final rules - called the Agro residue utilization by thermal power plants rules, 2023 - will be notified after two months by incorporating views of stakeholders on the draft, issued on 16/02/2023. The ministry sought experts and others interested in making any objections or suggestions on the proposals to forward their comments within 60 days.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
3
Publication Date: 
16/02/2023
Document Type: