Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileShLGs8 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

NDPL wants 1500kW solar power before 2010 Games

shompa's picture

New Delhi: In line with its commitment to minimize greenhouse gases, discom NDPL has prepared an ambitious plan to tap renewable sources of energy. Apart from its several solar projects that already exist, the discom is working on various other plans with an aim to generate up to 1500kW power from solar energy before the Commonwealth Games.

Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=CAP/2010/03/22&PageLabel=6&EntityId=Ar00605&ViewMode=HTML&GZ=T
Main Type: 
Publication Date: 
22/03/2010