Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filekc7ogn could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

KIOCL Ltd to set up 5MW solar power plant at Gundlupet

daya's picture

MANGALURU: KIOCL Ltd which requires around 30MW power for its on-going operations in this coastal city is betting big on solar power.

state: 
Name of the Newspaper: 
Main Topic: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
https://timesofindia.indiatimes.com/city/mangaluru/kiocl-ltd-to-set-up-5mw-solar-power-plant-at-gundlupet/articleshow/68342831.cms
Publication Date: 
11/03/2019