Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filemySflF could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

India to install 54.7 GW wind capacity by 2022: Fitch Solutions

daya's picture

India is likely to install 54.7 GW of wind capacity by 2022 against the 60-GW target set by the government, Fitch Solutions Macro Research has said in a report.

Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
https://www.thehindubusinessline.com/economy/india-to-install-547-gw-wind-capacity-by-2022-fitch-solutions/article26971723.ece
Publication Date: 
29/04/2019