Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filelJuPze could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Hinduja power faces big cost overrun

ipsita's picture

Various delays have led to the project cost of the Hinduja National Power Corporation Ltd in Visakhapatnam shooting up by Rs 300 crore to Rs 4,300 crore. One of the major fast-track private power

thesaurus: 
Main Topic: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
Main Type: 
dte-DNB
Publication Date: 
03/02/1998