Skip to main content
You are here
Home
»
News
»
Govt to bear 80% cost of generating solar power
Error
The specified file
temporary://filePj5mjl
could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
Govt to bear 80% cost of generating solar power
Submitted by
ipsita
on Mon, 2007-12-03 10:30
thesaurus:
Renewable Energy
Main Topic:
Climate Change
Name of the Newspaper:
Business Standard (New Delhi)
Mark Content Private(Internal):
Clipping Type:
DNB
External URL:
Main Type:
dte-DNB
Publication Date:
03/12/2007
Comments