Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filenDVaf9 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Gas power project work to begin soon

ipsita's picture

Chief Minister Sahib Singh has claimed that work on the construction of the Rs 700 crore gas based power project would start in the Capital by the end of this year. Work orders have already been

thesaurus: 
Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
Main Type: 
dte-DNB
Publication Date: 
09/12/1997