Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileziXRsn could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

French-led consortium to build 800-megawatt solar plant in Morocco

lalit's picture

A consortium led by French EDF Renewables won a tender to build an 800-megawatt solar plant near the Moroccan city of Midelt, local media reported on Wednesday.

Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
http://www.xinhuanet.com/english/africa/2019-05/22/c_138081048.htm
Publication Date: 
23/05/2019