Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filedXpxwh could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

China and US sign contract for power plant construction

ipsita's picture

China and the United States signed a contract calling for the installation of two 350 mw generating units at the Yuzhou Power Plant in central China's Henan

thesaurus: 
Main Topic: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
Main Type: 
dte-DNB
Publication Date: 
22/04/1998