Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filejYzQpb could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

BSES ties up for solar power in 2013

shompa's picture

Discom BSES has tied up with a Gurgaon-based firm for 50MW of solar power that will be available for the capital by March 2013. The MoU for 25 years between BSES and ACME Tele Power Ltd was signed on Tuesday. The agency is establishing solar power plants at various locations in Rajasthan with a total capacity of 150MW.

Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOI&BaseHref=CAP/2010/01/13&PageLabel=3&EntityId=Ar00305&ViewMode=HTML&GZ=T
Main Type: 
Publication Date: 
13/01/2010