Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileelBBCe could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Bhadradri power project a step closer to commissioning

daya's picture

Boiler of the first unit of 4×270 MW power project lighted-up on Monday

state: 
Name of the Newspaper: 
Main Topic: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
External URL: 
https://www.thehindu.com/news/cities/Hyderabad/bhadradri-power-project-a-step-closer-to-commissioning/article26637389.ece
Publication Date: 
26/03/2019