Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://file0eFDrc could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

The rupee factor (solar power costs)

susan's picture

In a country which reels under voluminous and bountiful amount of sunshine, tapping solar power should ideally be an effortless task. Ironically though, the economics have come in the way of the solar mission. The author unfolds the trend in India and what we can expect in the times to come.

Name of the Journal: 
Author: 
Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
12-16
1
2
Publication Date: 
01/11/2011