Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileQ8Ltv3 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

The risks of nuclear power

susan's picture

Designing and running nuclear power requires an entirely different mode of planning and assessment than possible with conventional risk analysis. There is little indication that the existing organisational culture of the Department of Atomic Energy permits such “over-the-horizon” creative thinking as is required.

Main Topic: 
Author: 
Name of the Journal: 
Mark Content Private(Internal): 
External URL: 
Additional image:: 
Main Type: 
Email Alert: 
22
16
46
Publication Date: 
16/04/2011