Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileavrnOd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

REC benefits - Opportunities for SHP developers

susan's picture

A small-hydro power (SHP) developer can either sell power directly to the state utilities at feed-in-tariffs determined by the state or indirectly through renewable energy certificate (REC) trading. In the latter case, the power generated is sold to the state discom at the average power purchase cost (APPC) or used for captive consumption and/or third party sale at marked-based prices.

Name of the Journal: 
Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
50-51
2
3
Publication Date: 
01/12/2012