Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileA6aB9e could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Optimization of hydraulic design of water supply tree network based on present worth analysis

susan's picture

Keeping in focus the rural area and its distribution system, a Regional Rural Water Supply Scheme (RRWSS) for 30 villages in Nashik District consisting of a distribution system from MBR (Master Balancing Reservoir) to GSR (Ground Service Reservoirs) of 30 villages is selected as a reference scheme for this study.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
67-71
1
44
Publication Date: 
01/01/2012