Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileInftht could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Economic feasibility for recycling of waste crystalline silicon photovoltaic modules

susan's picture

Cumulative photovoltaic (PV) power installed in 2016 was equal to 305 GW. Five countries (China, Japan, Germany, the USA, and Italy) shared about 70% of the global power. End-of-life (EoL) management of waste PV modules requires alternative strategies than landfill, and recycling is a valid option. Technological solutions are already available in the market and environmental benefits are highlighted by the literature, while economic advantages are not well defined. The aim of this paper is investigating the financial feasibility of crystalline silicon (Si) PV module-recycling processes. Two well-known indicators are proposed for a reference 2000 tons plant: net present value (NPV) and discounted payback period (DPBT).

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
1-7
Publication Date: 
27/06/2017