Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileE6rzF2 could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

DRDO unit not fit to handle union carbide waste : MPCB

The Maharashtra Pollution Control Board (MPCB) has told the Madhya Pradesh High Court in an affidavit that the DRDO facility at Nagpur has neither the requisite infrastructure nor the storage facilities for handling toxic waste from the Union Carbide plant in Bhopal. What's more, the incinerator at the facility has been non-functional for the past two years.

Name of the Journal: 
Mark Content Private(Internal): 
External URL: 
http://www.downtoearth.org.in/content/drdo-unit-not-fit-handle-union-carbide-waste-mpcb
Main Type: 
dte
Sep 07, 2011
Publication Date: 
07/09/2011