Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileZYc2Zz could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Estimating electric vehicle charging infrastructure costs across major U.S. metropolitan areas

sheeja's picture

This paper analyzes the capital costs of the electric vehicle charging infrastructure needed for public, workplace, and home charging for the most populous 100 metropolitan areas in the United States from 2019 through 2025. The 100 metropolitan areas analyzed represent 88% of all new electric vehicles sold and 75% of the overall U.S. vehicle market.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
11
Publication Date: 
12/08/2019
Document Type: