Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://filekVnUiT could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Thailand power system flexibility assessment

sheeja's picture

Thailand, aiming to assess the flexibility of its electricity mix in line with national expansion plans, has engaged with the International Renewable Energy Agency (IRENA) to carry out an initial FlexTool study. Along with the current investment plan, the Thai authorities wished to consider more ambitious levels of renewables in the power system, based on untapped potential identified in IRENA’s Renewable Energy Outlook: Thailand. Thailand’s power system is characterised by a high share of natural gas-fired capacity and low solar- and wind-based generation capacity. The current plan calls for increasing these variable renewable energy (VRE) sources some 7.5 gigawatts by 2036. IRENA’s REmap analysis, in contrast, indicates that the country could increases them by nearly three times as much.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
8
Publication Date: 
01/05/2019
Document Type: