Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileTIWedf could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Fedi based system at a combined cycle power plant in USA

susan's picture

This case study reports on the application of fractional electrodeionization (FEDI) in the production of high purity deionized water. The advantages of this two-stage dual voltage technology over conventional electrodeionization (EDI) are discussed, including better quality of treated water, ability to handle feed water fluctuations, optimized power consumption, and quick on-site regeneration of media. Opening data and experience from one power plant is presented.

Name of the Journal: 
Main Topic: 
Attachment(s): 
Author: 
Mark Content Private(Internal): 
Email Alert: 
266-268
Publication Date: 
01/09/2011