Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://file92mYXQ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Farooq push for geothermal, hydro power

csekiran's picture

RASHME SEHGAL

Pushing hard for renewable sources of energy, minister of new and renewable energy Farooq Abdullah has asked President of Iceland, Dr Olafur Ragnar Grimsson, to assist India in developing geothermal energy.
Iceland has been in the forefront of developing geothermal energy and hydro power and is currently generating 575 MW geothermal energy against a capacity of 10,500 MW.

Main Topic: 
Name of the Newspaper: 
Mark Content Private(Internal): 
Clipping Type: 
DNB
IGF
External URL: 
http://epaper.asianage.com/ASIAN/AAGE/2010/01/16/ArticleHtmls/16_01_2010_005_010.shtml?Mode=1
Main Type: 
Publication Date: 
16/01/2010