Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileBsQEkd could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Feasibility study of biogas production from flower waste

susan's picture

This study was undertaken to find out the biogas production potential of flower waste coming out from temples. Laboratory scale digesters of 1.5 L capacity were used and fed with flower waste without and with pretreatment.

Main Topic: 
Mark Content Private(Internal): 
External URL: 
Main Type: 
dtelocal
Email Alert: 
597
7
27
Publication Date: 
01/07/2007