Error, click for more details
Click to see notifications
Error, click for more details
Error
The specified file temporary://fileSUpMAZ could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.

Question raised in Rajya Sabha on Interlinking of Rivers, 21/11/2016

sheeja's picture

Question raised in Rajya Sabha on Interlinking of Rivers, 21/11/2016. Under the National Perspective Plan for water resources development through inter basin transfer of water prepared by the this Ministry, National Water Development Agency (NWDA) has identified 30 links (16 under Peninsular Component & 14 under Himalayan Component) for preparation of Feasibility Reports. The pre-feasibility report of the all 30 links have been prepared and circulated to the concerned State Govts. by the NWDA. After survey and investigations, Feasibility Reports of 14 links under Peninsular Component and Feasibility Reports of 2 links and draft Feasibility Reports of 7 links (Indian portion) under Himalayan Component have been completed. Present status, States concerned and States benefitting from Inter Basin Water Transfer Links are given in Annexure.

Main Topic: 
Mark Content Private(Internal): 
Email Alert: 
Publication Date: 
Monday, November 21, 2016
Publisher : 
Document Type: