The specified file temporary://fileeDCg3n could not be copied, because the destination directory is not properly configured. This may be caused by a problem with file or directory permissions. More information is available in the system log.
Among steps undertaken by the municipally owned Stockholm Water were renovation of the waste water network, construction of a storm sewer overflow basin and measures to reduce the load on pipes and treatment plants.